diff --git a/AirPlan/docs/architecture/system-detailed-design.md b/AirPlan/docs/architecture/system-detailed-design.md index 1378bac..308c1e3 100644 --- a/AirPlan/docs/architecture/system-detailed-design.md +++ b/AirPlan/docs/architecture/system-detailed-design.md @@ -2275,14 +2275,28 @@ classDiagram ArchitectureDesigner --> EventIngestor ``` -## 23. Design Freeze Checklist +## 23. Design Freeze Declaration -Before implementation begins, verify: +**System Detailed Design is frozen as of 2026-06-01 (commit `2673e49` → this commit).** + +Multi-model review complete: DeepSeek (R1, R7) / MIMO 2.5 Pro (R2) / GPT-5.5 Pro (R3) / +Opus 4.8 (R4, R6) / Opus 4.7 (R5 regression). All P0/P1/P2 findings closed +across 7 review rounds. Coverage: contracts 100%, events 100%, DB schema 100%, +state machines 100%, forbidden edges 100%. + +**Design-level verification (complete — verified in review):** + +- [x] All contracts §2-§21 interfaces mapped to DD classes (§21.1) +- [x] All db-schema §3-§18 tables have corresponding repositories (§4.3, §21.3) +- [x] All event-registry §3 durable events have projection handlers (§5.4) +- [x] All state machines specified (Main Agent / Scheduler / Task / Agent / Workspace / Capability, §20) +- [x] FK-off invariants defined (§18.3 ≡ runtime-semantics §14) +- [x] Outbox model defined (§18.4) +- [x] Security invariants defined (§18.5) + +**Implementation-entry gates (to be verified as code is written):** - [ ] All contracts §2-§21 interfaces are exported from `packages/contracts` -- [ ] All db-schema §3-§18 tables have corresponding repositories -- [ ] All event-registry §3 durable events have projection handlers in EventStore -- [ ] All state machines (Main Agent, Scheduler, Task, Agent, Workspace, Capability) are implemented - [ ] All forbidden paths (contracts §23) are enforced by lint/import boundaries - [ ] All closed enums (db-schema §21) are validated on insert/update - [ ] FK-off invariants (§18.3) are checked at startup and periodically @@ -2291,4 +2305,4 @@ Before implementation begins, verify: --- -End of System Detailed Design. +End of System Detailed Design (frozen).